Past Projects

  • T-2001

    This project consisted of multiple median closures and modifications on Bellaire Boulevard from Mary Bates to Beltway 8 and the addition of a westbound lane. Additionally, there have been modifications to seven existing signals and the installation of one new signal.

  • T-2026

    This project included improvements to existing bus stop shelters along major METRO lines to improve transit user safety and commuter experience.

  • T-2017

    This project consisted of remedying issues associated with an existing detention pond constructed in the park in 2012, including repairing the sides of the basin slopes, which had eroded.

  • T-2015

    The project consisted of updating amenities, including sidewalks in Lansdale Park.

  • T-2007

    The project included replacement of approximately ½ mile asphalt walking trail with a ½ mile concrete trail.  Other enhancements consisted of benches, picnic tables and trees along with irrigation and removal of the asphalt pad.

  • T-2006

    The project included replacement of approximately ½ mile asphalt walking trail with a ½ mile concrete trail.  Other enhancements consisted of benches, picnic tables and trees along with irrigation and removal of the asphalt pad.

  • T-2022

    This project included the implementation of three HPW led projects with TIRZ 20 funding share. 1. Design of Hillcroft St. as Gulfton's main street. 2. Gateway to Gulfton & High Star Community Plaza. 3. Westward Street Shared-Use Path.

  • T-2018

    Beautification project that included the addition of ornamental lights at five intersections along Bellaire Boulevard from Fondren Rd. to Beltway 8.

  • T-2002

    This project consisted of the reconstruction of sections along Fondren Road and improvements to intersections, from Westpark to Highway 59 including improvements to drainage conditions.

  • T-2003

    This project included safety improvements including sidewalks and lighting along roadways in the social services corridor.