Reconstruction

Harwin Drive Mobility and Drainage Improvements (Drew to Fondren)

2024-09-03T15:51:57-05:00

The project includes replacement of the approximately 50% of existing concrete panels as well as the reconstruction of the existing sidewalks and driveways along Harwin Drive, and replacement/betterment of existing 8" to 12" water main, an additional exclusive right-turn lane from the EB Harwin onto the SB Fondren Road.

Go to Top