The project includes replacement of the approximately 50% of existing concrete panels as well as the reconstruction of the existing sidewalks and driveways along Harwin Drive, and replacement/betterment of existing 8" to 12" water main, an additional exclusive right-turn lane from the EB Harwin onto the SB Fondren Road.

Bellaire Boulevard Reconstruction
clabod2024-02-05T19:50:09-06:00This project consisted of multiple median closures and modifications on Bellaire Boulevard from Mary Bates to Beltway 8 and the addition of a westbound lane. Additionally, there have been modifications to seven existing signals and the installation of one new signal.

Fondren Access Management Mobility Improvements
clabod2024-02-05T19:51:34-06:00This project consisted of the reconstruction of sections along Fondren Road and improvements to intersections, from Westpark to Highway 59 including improvements to drainage conditions.