T-2024
The project consists of repairs and replacement to selected existing damaged and missing sidewalks throughout the zone as well as miscellaneous curb and ramp repairs.
- Phase I is complete. 10,653 LF of new sidewalks have been built.
- Phase II is complete. 9,980 of new sidewalks have been built.
- Phase III is currently being designed. Approximately 10,000 LF are expected to be built in this phase.
Status: Phase I and Phase II are complete. Phase III is in design phase.
PHASE I
0 LF
OF 10,653 LF
SIDEWALKS
PHASE II
0 LF
OF 9,980 LF
SIDEWALKS
PHASE III
0 LF
OF 10,000 LF
SIDEWALKS