Highlight

Club Creek Detention Basin & Park

2024-02-05T19:47:23-06:00

A park and greenspace facility that includes a 120 acre-feet detention basin, multi-use trails, playground area, fitness equipment, Vietnam Veterans War Memorial, and associated parking, located at Country Creek Street and Club Creek Drive.  This project was jointly funded by the TIRZ, City of Houston and Harris County Flood Control District. This project was recently completed in 2023 and the park is open to the public.

Harwin Drive Mobility and Drainage Improvements (Gessner to Fondren)

2024-07-15T15:29:44-05:00

The project includes replacement of the approximately 50% of existing concrete panels as well as the reconstruction of the existing sidewalks and driveways along Harwin Drive, and replacement/betterment of existing 8" to 12" water main, an additional exclusive right-turn lane from the EB Harwin onto the SB Fondren Road.

Regional Hike and Bike Trails (CenterPoint Trail / Sharpstown Trail)

2024-03-08T15:47:01-06:00

This project includes a 3.12-mile concrete CenterPoint Trail parallel to S. Gessner Rd between Westpark Tollway and Southwest Freeway connecting to the Brays Bayou Greenway Trail. The project is divided in three phases, Phase I consists of the area between Sands Point Drive to Beechnut Street and Phase II consists of Beechnut Street South to Brays Bayou Greenway.

Go to Top